Samples in five working days, production in 25–35
The dates do not live in a brochure. They are gate-to-gate: what has to be approved before the run is released, and what the ship actually takes.
What we work to, stage by stage
Same table whether it is a stock order or an OEM program — what changes is which line starts the clock.
| Stage | What it covers | Time |
|---|---|---|
| Sales reply | Initial response to every inquiry, with a preliminary quote and sample options | Within 1 day |
| Sample lead time | Standard samples from existing molds, ready for shipment | 5 working days |
| Production lead time | Standard production, after deposit and artwork confirmation | 25–35 days |
| Ocean freight | FOB Ningbo or Shanghai to West Coast ports; East Coast routing adds 10–14 days | 18–28 days |
| Working hours | Sales and engineering team coverage, Monday through Saturday | Mon–Sat |
Two further figures have been stated in our own sourcing notes — 7–15 days for a SKU held in stock, 30–45 days for an OEM run with new artwork or marking changes. They are not yet confirmed as a per-order table, so they are quoted per order rather than stated here.
What a sample order covers
Sampling exists to catch a marking, a finish or an artwork problem while it is still cheap to fix.
Standard models
Samples from existing molds, in any of the seven finishes, shipped in five working days.
Cost approach
Sample cost and freight are usually charged, and can be credited against the first production order.
Private-label proof
Where markings, artwork or carton identity change, the sample is what the artwork is approved against — before the run, not after the cartons are printed.
Finish samples
Colour chips and finish samples for property or retail programs, so the specification and the shelf agree before the order is placed.
Four things that reset the clock
Production starts after the deposit and after artwork confirmation. Anything that changes the carton or the marking restarts the count at approval, not at the purchase order.
The standard bands assume nothing has to be designed, tooled or registered. In practice most slippage on a first program order comes from one of the four lines below, and three of them are decisions on your side rather than capacity on ours.
- Stock supply moves faster than a production run. Ask for the current position on the models you need before you build a deadline around production.
- A new tool, a new colour or a new box design adds its own approval step before production can be released.
- Multiple listing of your brand in UL's directory is a documentation process measured in weeks. It belongs at quotation stage, not beside the shipping deadline.
- Holiday shutdowns are not inside the standard bands. Confirm the window against your delivery date on the quote.
The terms that travel with the schedule
Quoted per order, stated here so the first conversation is about models and dates rather than paperwork.
| Item | Terms |
|---|---|
| Payment | 30% T/T deposit with the order, 70% T/T before shipment. L/C at sight negotiable on larger or returning accounts. |
| Trade terms | FOB Ningbo or Shanghai; CFR, CIF and DDP to US and Canadian addresses quoted per order. |
| Minimum order | Varies by product family, and between stock supply and new OEM tooling. The minimum for your models is stated in the preliminary quote — we do not publish one number for the whole catalog. |
| Working days | Sample lead time is quoted in working days; production and transit are quoted in calendar days. We state which is which on every quote. |
Four models that answer most first questions
One from each family, in the finish you ask for.
What we quote rather than publish
A lead time without a quantity band is a guess, and we would rather hand you the quote than the guess.
- Tell us the models, the quantity and the destination, and the quote states the lead time for that order rather than a catalog average.
- Sample cost and freight are usually charged and creditable against the first production order.
- Nothing ships without the document set, so the lead time you are quoted includes the paperwork rather than adding it afterwards.
Calendar, working days and what delays a run
How fast can I get a sample?
Five working days from existing molds, in any of the seven finishes. Sample cost and freight are usually charged and can be credited against the first production order.
Are the 25–35 days calendar or working days?
The production band is stated in calendar days after deposit and artwork confirmation; the sample lead time is stated in working days. Every quote says which unit each date is in.
What can delay a production run?
Artwork, markings, tooling, a finish change, or a barcode assignment that has not been decided. Each one has to be approved before production is released, and each one restarts the count at approval.
Do you hold stock?
Stock supply exists alongside production, and it is the faster route when the model you need is on hand. We do not publish a stock list — name the models and we state the position with the quote.
When do the documents arrive?
With the shipment: UL certificate, UL test report, commercial invoice, packing list, certificate of origin and product submittal sheets. Private-label orders add the markings, packaging design and barcode assignment documentation.
The rest of the wholesale program
Send the list, get the package back
Model list, quantities and project type is all we need to start. The quotation comes back in one business day with the specification sheet for each line item, the listing reference it holds and the packing detail for the DC — one document, not four.
WhatsApp / Mobile +86 159 5875 8125Prefer email? sales@syoutlet.com
15A Tamper-Resistant Self-Test GFCI Outlet15A · 5-15R
15A Weather-Resistant Self-Test GFCI Receptacle15A · 5-15R
15A 65W PD USB-C + 18W QC USB-A15A · 5-15R · 65W maximum combined output
15A Tamper-Resistant Duplex Receptacle15A · 5-15R